Production expansion

in the field of blasting systems.

19. June 2020

Investing in additional new blasting systems allows us to expand our production capacities continuously.

With our ten state-of-the-art machines, we are now in a position to operate a separate system for each of our blasting media. This rules out the possibility of cross-contamination and allows us to achieve perfect results for our customers.

The latest news – we keep you updated at all times

Viktor Hegedüs GmbH: Fixator Video Thumbnail

FIXATOR – save time effectively

Time-saving, precise and surprisingly easy to use. With our FIXATOR, components for measuring machines and laser marking systems can be clamped more quickly, more easily and with a high degree of repeat accuracy.
Viktor Hegedüs GmbH: News, Summer vacation

Summer vacation 2023

We are on vacation from 07.08.2023 to 18.08.2023 inclusive.
Viktor Hegedüs GmbH: Aktuelles, Solaralternative

Investing in green power

Viktor Hegedüs GmbH has invested in sustainable energy generation and installed a 125kWp photovoltaic system in Wehingen.
Viktor Hegedüs GmbH: Fixator Video Thumbnail

FIXATOR – save time effectively

Time-saving, precise and surprisingly easy to use. With our FIXATOR, components for measuring machines and laser marking systems can be clamped more quickly, more easily and with a high degree of repeat accuracy.
Viktor Hegedüs GmbH: News, Summer vacation

Summer vacation 2023

We are on vacation from 07.08.2023 to 18.08.2023 inclusive.
Viktor Hegedüs GmbH: Fixator Video Thumbnail

FIXATOR – save time effectively

Time-saving, precise and surprisingly easy to use. With our FIXATOR, components for measuring machines and laser marking systems can be clamped more quickly, more easily and with a high degree of repeat accuracy.
Viktor Hegedüs GmbH: News, Summer vacation

Summer vacation 2023

We are on vacation from 07.08.2023 to 18.08.2023 inclusive.
Viktor Hegedüs GmbH: Aktuelles, Solaralternative

Investing in green power

Viktor Hegedüs GmbH has invested in sustainable energy generation and installed a 125kWp photovoltaic system in Wehingen.